Home >>  Electronics  >>  railway control ststem using microprocessor

Railway control ststem using microprocessor
| Views: 27863


 

  • Do you want to do this project?

  • Name:   
  • Email:     
  • Phone:   
The aim of this project is to demonstrate the incorporation of computer method in railway traffic control to improve, safety, speed of handling the traffic and reliability. Here we employ the microprocessor (Intel 8085) to handle the signaling, track changing and gate operation and to monitoring the traffic. The system starts with the tracking if the train is sensed at the station side or starts with the gate operation (i.e. gate closing and opening) along with the track changing if the train is sensed at the gate side. Once the train arrival is sensed at a distance of about 3 kms the microprocessor performs the gate operation along with the track changing, the identification of the train is done at a distance of 3 kms accordingly the particular operation is performed by the processor.Depending upon the priority of the incoming train, the unengaged track is given for train halting.
Vote: Tell A Friend
Reply With Quote  

 

  

hi i'm doing my  3rd yr EIE, i'm interested in this project can u send me the full details of it?

my mail id is kumarr.aswin@gmail.com

i need it as soon as possible.........

 

Reply With Quote   Reply With Quote

 

  

hello I am a final year student so can you send me the full details of this project at my id

my id is sumit_ssos@yahoo.co.in

Reply With Quote   Reply With Quote

 

  
i am interested in ur project could u funish full details of it
Reply With Quote   Reply With Quote

 

  
CAN I GET THE DETAIL OF THIS PROJECT AND PLEASE SEND IT TO MY EMEL thank you.
Reply With Quote   Reply With Quote

 

  

hello,good day i am a3rd year computer wscience student and iam interested to your this one can you send me the full detail of this one

plz..send it on my yahoo mail

khabhute_03@yahoo.com

thank you 

Reply With Quote   Reply With Quote
Page 4 of 10